Construction RAMS Generator
Create a site-specific draft Risk Assessment and a separate Method Statement for construction work. Add multiple activities, assess initial and residual risk, and export professional reports.
1. Project and site details
2A. Risk Assessment
Risk score 1–10 is derived from Likelihood (1–5) × Severity (1–5), scaled to 10. 1–2 Low (green), 3–4 Moderate (yellow), 5–7 High (orange), 8–10 Very High (red).
Edit headings, paragraphs and table cells directly. The PDF will contain this edited version.
2B. Method Statement
Complete this separately. The generated sequence incorporates the project details, site factors and selected construction activity.
Edit the generated sequence, controls and wording directly. The PDF will contain your edited version.
Risk-control principles
Apply controls in order: eliminate the hazard where reasonably practicable; substitute a safer method or material; use engineering and collective protection; introduce safe systems, permits, supervision and training; then use suitable PPE as the final layer. Reassess the residual risk and stop work if controls are absent or conditions change.
Frequently asked questions
Is a generated RAMS automatically compliant?
No. It is a structured draft and must be made site-specific, checked against current law and guidance, and approved by a competent dutyholder.
When must it be reviewed?
Before work, after material changes, new information, an incident or near miss, control failure, or when the planned review date is reached.
Are separate COSHH, lifting or temporary works documents still needed?
Yes, whenever applicable. This generator does not replace specialist assessments, designs, permits, inspection records or emergency rescue plans.
Guidance: HSE construction administration and method statements · CDM 2015