Reduced Level & Level Book Calculator
Calculate reduced levels using the Height of Instrument method with benchmark RL, backsight (BS), intermediate sight (IS), foresight (FS) and change points.
Important: verify field-book sequencing, instrument setup, benchmark datum and closure independently before construction use.
How to use this calculator
Quick example: load the example to calculate two instrument setups and an exact arithmetic check.
1. Enter level-book observations
The first row must contain a BS. A change-point row normally contains an FS from the old setup and a BS for the new setup.
2. Level-book results
Enter a benchmark RL and observations.
| Point | BS | IS | FS | HI | RL | Remarks |
|---|
Export results
Height of Instrument method
HI = known RL + BS. For each observed point, RL = HI − IS or HI − FS. At a change point, the FS produces the change-point RL, then the BS establishes the next HI.
- Only one of IS or FS may be entered on a row.
- A change-point row may contain FS and BS together.
- The final observation should normally be an FS onto a known or closing point.
- Arithmetic agreement checks transcription and calculation, but not every field blunder.
Frequently asked questions
What is a reduced level?
RL is the elevation of a point relative to an adopted datum.
What is a backsight?
A BS is the first reading from an instrument setup onto a point of known RL, used to calculate HI.
What is a foresight?
An FS is normally the last reading before moving the instrument, often taken on a change point or closing benchmark.
What is an intermediate sight?
An IS is any other reading from the current instrument setup onto a point whose RL is required.
What is the arithmetic check?
The sum of BS minus the sum of FS must equal the final calculated RL minus the starting RL.
Explore more calculators on the Site Survey tools page.