Drainage Take-off & Trench Quantities

DRAINAGE COMMERCIAL TOOL

Drainage Take-off & Trench Quantities

Convert drainage run geometry into traceable pipe, excavation, bedding, surround, backfill, reinstatement and muck-away quantities.

✓ Multi-run take-off✓ Trench material balance✓ BOQ & cost estimate✓ CSV & PDF reports
PROJECT & ASSUMPTIONS

Take-off basis

Optional budget rates

Quantity basis: this is a geometric estimate. Confirm pipe outside diameters, trench support, working space, formation, overbreak, groundwater, structures, service crossings, temporary works and disposal classification before procurement.

DRAINAGE RUNS

Pipe and trench schedule

Compatible with exported multi-point drainage data when columns for run ID, nodes, length, levels and diameter are available. Open Drainage Run Checker →

Run IDFromToLength mPipe OD mmGround startGround endInvert startInvert endTrench width mmBedding mmSurround above mmReinstatement mmReuse %Surface / note
QUANTITY SUMMARY

Drainage material balance

Pipe including allowance0.00 m
Excavation0.00 m³
Bedding & surround0.00 m³
Imported backfill0.00 m³
Muck-away loose0.00 m³
Budget estimate£0.00
RunPipeAverage depthExcavationBeddingSurroundSelected backfillImported backfillReused spoilReinstatementMuck-awayWarnings
COMMERCIAL OUTPUT

BOQ and report

GUIDANCE

How the drainage take-off is calculated

  1. Define each pipe run. Enter its true plan length, pipe outside diameter, ground levels and invert levels at both ends.
  2. Confirm trench geometry. Enter the construction width, bedding, surround above crown and reinstatement depth required by the detail.
  3. Review average depth. The tool averages the start and end trench depths. Stepped, irregular or deep runs should be divided into representative sections.
  4. Calculate the material zones. Bedding is below the pipe; surround includes the pipe zone and cover above crown less the pipe displacement.
  5. Balance excavated and imported fill. The selected reuse percentage controls suitable excavated material returned as backfill. Remaining backfill is treated as imported.
  6. Apply bulking and allowances. Loose muck-away includes the selected spoil bulking factor; pipe and granular quantities include their stated wastage allowances.
Does excavation include manholes?

No. Pipe trench runs are calculated here. Manholes, catchpits, headwalls, thrust blocks and chambers should be measured separately unless represented as explicit ancillary BOQ items.

Why is pipe displacement removed?

The physical pipe occupies part of the surround zone and creates surplus excavated material. Its external cylindrical volume is therefore deducted from the granular surround volume.

Can the quantities be used for ordering?

They provide a structured estimate. Ordering should follow checked construction drawings, pipe manufacturer data, site conditions, procurement pack sizes and an authorised commercial review.

Is project data uploaded?

No. Calculations and exports are completed locally in the browser.