With two decades of experience in construction and civil engineering, I am a highly skilled Civil Site Engineer based in Market Rasen and capable of operating beyond the Lincolnshire area.
About Me
Experienced Freelance Civil Site Engineer with Over 20 Years of Expertise in the Industry
I am a highly experienced Freelance Site Site Engineer with a career spanning over two decades in the industry. My comprehensive knowledge of construction and civil engineering is the result of my extensive background in the field. I primarily operate in the Market Rasen area and its surrounding regions in Lincolnshire, UK, but my expertise extends beyond these boundaries. As a professional, I maintain a formal tone of voice in all my interactions.
What Services I'm Providing
Land Survey
I’m a site engineer, and one of my main jobs is doing a ‘Land Survey’. This isn’t just drawing the edges of a piece of land. I look closely at the land to find where its boundaries are, its highs and lows, and other special features like hills or ponds. I write down everything I see. If there’s a big pile of dirt on the site, I also measure how much is there. This helps us plan what to do with that dirt, like whether to move it, use it, or keep it there. Basically, the Land Survey helps us know the land well so we can build things the right way.
My Skills
Total stations and gnss
Total Stations and GNSS are advanced surveying tools that allow for precise measurement and mapping of construction sites. As a seasoned Construction Site Engineer, I am proficient in the use of these instruments, ensuring accuracy and efficiency in all aspects of the construction process.
Autocad
As a seasoned Construction Site Engineer, I possess a strong knowledge of AutoCad, a computer-aided drafting software used in the construction industry. With my expertise in this software, I am able to create detailed and accurate drawings that aid in the planning and execution of construction projects.
Archicad and bim
As a Construction Site Engineer with over 20 years of experience, my strong knowledge of ArchiCad and BIM has proven to be invaluable in ensuring the successful completion of projects. With these skills, I am able to effectively collaborate with architects and designers, streamline processes, and produce accurate and detailed construction plans.
Work Experience
RESIDENTIAL CONSTRUCTION & MANAGEMENT EXPERIENCE
Key Responsibilities:
Design & Planning: Collaborated with architectural and design teams to facilitate the accurate execution of residential layouts and plans.
Setting Out: Led the setting out processes for house foundations, kerbs, access roads, and footways, ensuring precision in layout.
Quality Control: Conducted rigorous checks against method statements, quality plans, and inspections, affirming all constructions adhered to specified quality standards.
Construction Management: Worked closely with the project management team to address discrepancies in construction drawings, ensuring all builds aligned with approved designs.
Issue Resolution: Actively resolved unforeseen technical challenges during the construction process, ensuring steady project progression.
Achievements:
- Crucial in the timely completion of a major residential development, comprising several residential units.
- Introduced an enhanced setting out process that significantly improved accuracy and reduced instances of rework.
ROAD CONSTRUCTION & MANAGEMENT EXPERIENCE
Key Responsibilities:
- Setting Out: Spearheaded the setting out processes for main roads, link roads, acoustic bunds, footways, and drainage systems, emphasizing precision and durability.
Quality Control: Led rigorous quality checks against method statements, quality plans, and inspections to guarantee all constructions were up to code and met regional standards.
Utility Integration: Oversaw the accurate placement and setting out for utility installations, including gas pipes, water pipes, lighting posts, and other essentials.
Issue Resolution: Proactively addressed and resolved technical challenges and other unforeseen issues, ensuring minimal project delays.
Achievements:
- Played a pivotal role in the on-time completion of a crucial roadway project, enhancing regional connectivity.
- Implemented innovative setting out techniques that optimized workflow and reduced the need for corrections.
PILING & FOUNDATION EXPERIENCE
Key Responsibilities:
- Piling Oversight: Supervised and managed the entire piling process, from borehole drilling to casting, ensuring that piles met depth and diameter specifications.
Quality Control: Conducted rigorous pre-pour inspections and supervised concrete pouring processes to ensure all pilings met the structural and regulatory criteria.
Equipment Calibration: Regularly inspected and calibrated piling machinery and equipment, ensuring optimal performance and accuracy during operations.
Groundwork Coordination: Led teams in groundwork activities, including capping beam columns, starter RC, and ensuring that all foundation-related tasks were integrated efficiently with other construction stages.
Issue Resolution: Addressed unexpected geological challenges and resolved technical difficulties swiftly to minimize disruptions to the project timeline.
Achievements:
- Pivotal in the successful establishment of deep foundations for a significant construction project, ensuring structural integrity and compliance with safety standards.
- Introduced advanced piling techniques that resulted in faster execution and higher precision, reducing project costs.
INSPECTION & TEST PLAN (ITP) – PILING MAT
Key Responsibilities:
- Preparation and Planning:
- I developed and reviewed the Inspection and Test Plan (ITP) for the piling mat to ensure all aspects of the project were covered.
- Quality Control and Assurance:
- I ensured that all materials and work complied with the project specifications, standards, and codes.
- I conducted regular inspections and tests to verify the quality of materials used and work performed.
Documentation and Reporting:
I maintained detailed records of all inspections, tests, and quality control activities.
- I prepared and submitted regular reports on the status of the piling mat construction, highlighting any issues or non-conformances.
Supervision and Coordination:
- I oversaw the work of contractors and subcontractors to ensure adherence to the ITP and project schedule.
Problem Solving and Issue Resolution:
- I identified potential issues or non-compliance during the piling mat construction and took corrective actions promptly.
- I collaborated with the design team to address any design-related issues or modifications required.
Health, Safety, and Environmental Compliance:
- I ensured all construction activities complied with health, safety, and environmental regulations.
- I conducted regular site safety audits and implemented corrective measures as needed.
Achievements:
Successful Project Delivery:
- I achieved timely and successful completion of the piling mat project in accordance with the project schedule and budget.
- I ensured that all quality standards and specifications were met, resulting in a high-quality and durable piling mat.
SETTING OUT & QUALITY CONTROL OF PILES FOR CONCRETE CAPPING FOUNDATION
Key Responsibilities:
Setting Out:
- I established accurate reference points and markers for the positioning of piles, ensuring precise alignment and spacing according to the design specifications.
- I used advanced surveying tools and techniques to verify the correct location and elevation of each pile before construction began.
Quality Control of Materials:
- I ensured that all materials used for piling, including concrete and reinforcement, met the required standards and specifications.
- I conducted regular tests on concrete samples to check for strength, consistency, and other critical parameters.
Inspection and Testing:
- I performed regular inspections during the pile installation process to detect any deviations or issues.
- I arranged for load testing of piles to verify their load-bearing capacity and structural integrity.
Documentation and Reporting:
- I maintained detailed records of all inspections, tests, and quality control activities related to the piling work.
- I prepared and submitted comprehensive reports on the progress and quality of the pile installation to project stakeholders.
Achievements:
Accurate Setting Out:
- I achieved precise setting out of piles, ensuring accurate alignment and spacing that met the design specifications.
- I minimized errors and rework through meticulous planning and use of advanced surveying techniques.
Successful Pile Installation:
- I oversaw the successful installation of piles, achieving the desired depth, alignment, and verticality for each pile.
- I ensured that all piles were installed according to the construction plan, avoiding any deviations or issues.
SITE ENGINEERING FOR LANDFILL WASTE MANAGEMENT
Key Responsibilities:
Surveying and Monitoring of Works on Site:
- I conducted detailed surveys and continuous monitoring of landfill operations to ensure compliance with project plans and environmental regulations.
- I used advanced surveying equipment to measure and record site conditions, documenting any changes or deviations from the plan.
Managing Technical Queries:
- I handled technical queries from contractors and stakeholders, providing accurate and timely information to resolve issues.
- I coordinated with design engineers and environmental specialists to address complex technical challenges.
Ensuring Quality Control:
- I ensured that all quality control requirements were met and documented in accordance with project specifications and standards.
- I conducted regular inspections and tests to verify the quality of materials and workmanship on site.
Producing 3D Models Using LSS:
I created detailed 3D models of the landfill site using Land Survey System (LSS) software to aid in planning and monitoring.
- I used these models to visualize site changes, plan earthworks, and communicate project progress to stakeholders.
- Calculating Earthworks Volumes:
- I calculated earthworks volumes to assist in the planning and execution of landfill operations.
- I used the data to optimize material usage, manage site resources efficiently, and ensure accurate billing and reporting.
Achievements:
Effective Site Monitoring and Surveying:
- I successfully conducted comprehensive surveys and monitoring of the landfill site, ensuring accurate documentation and compliance with environmental regulations.
- I identified and addressed site issues promptly, maintaining project integrity and environmental standards.
Resolution of Technical Queries:
- I effectively managed technical queries, providing clear and accurate information that resolved issues quickly and efficiently.
- I collaborated with various stakeholders to ensure all technical aspects of the project were understood and addressed.
Maintaining High-Quality Standards:
- I ensured that all quality control measures were met, resulting in high-quality work that complied with project specifications.
- I documented all quality control activities meticulously, providing a reliable record for future reference and audits.